Cable Stayed Bridge Feasibility Study

PROJECT: Feasibility Study of a Cable Stayed Bridge at Sreemangal.

Firm: Joint Venture of JDC, MDC & D8 Consultants Ltd. (D8CL).

CLIENT: Paragon Group

LOCATION: Sreemangal

PROJECT DESCRIPTION: 

Main objective of this Cable Stayed Bride is to establish communication network between two parts of a valley at Sreemangal for developing a resort . Achieve safe and faster internal communication system in this area.

Project components of this Cable Stayed Bridge  consists of the following:
i) Construction of Bridge – 650 meter
ii) Construction of approach road – 1.21 kilo meter
iii) Acquisition of Land – 1.46 Acre
how can we help you?

Contact us at the D8 office nearest to you or submit a Design Service inquiry online.

D8 is striving to provide engineering and architectural design solutions that meet demanding schedules and exceed client expectations.

Executive Director’s Quotes

Architecture is the thoughtful making of the space

Louis Kahn

Looking for a professional bridge design consultant?